Progress
Director, Agriculture & Food Production, Bhubaneswar invites bids for Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) with Inverter (V2) (Q2) for execution in Rayagada, Odisha 764062. The BOQ shows zero items listed, indicating an opportunity with undefined quantity, while the scope emphasizes ISI compliance and inverter technology. Bidders must consider an option to adjust quantity up to 25% at contract, with delivery timelines tied to the original order date and extended periods. Key bid safeguards include uploading the product Data Sheet, ensuring non-obsolescence with at least 5 years residual market life, and providing a Malicious Code Certificate. GST applicability will follow actual rates. A Data Sheet mismatch can lead to bid rejection, and precautionary measures for hazardous chemicals are required per regulations.
Product: Split Air Conditioner (Wall Mount Type) ISI marked to IS 1391 (Part 2), Q2
Power/Technology: Inverter (V2), Q2 performance specification
Documentation: Upload Data Sheet and ensure alignment with offered parameters
Security/Quality: Provide Malicious Code Certificate for hardware/software
Market life: Minimum 5 years residual market life before end-of-life declaration
GST: Reimbursement as per actuals or applicable rates, whichever is lower
Hazardous materials: Compliance with regulations for any hazardous chemical handling
Option to increase/decrease quantity up to 25% at contract time
Data Sheet verification; mismatches may lead to bid rejection
Malicious Code Certificate mandatory for security integrity
Non-obsolescence requirement: product must have ≥5 years market life
GST as per actuals; supplier bears responsibility for GST calculations
GST and pricing follow actual rates; no specific advance or milestone terms stated
Delivery period linked to original delivery order date; duration extension formula provided with minimum 30 days
Not specified in available terms; bidder risk assessment needed during bid submission
Not in liquidation or court proceedings; valid undertaking required
Proof of GST registration and PAN; data sheet alignment with offered product
OEM authorization or authorized dealer for ISI-marked wall-mount split AC with inverter
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M/S POWER MAX Under PMA | Make : SAMSUNG Model : AR50H19D1XHNNA | 26-09-2026 17:46:02 | |
| 2 | SANGANAKAH TECHTRONIC PRIVATE LIMITED Under PMA | Make : SAMSUNG Model : AR50H19D1XHNNA | 26-09-2026 16:20:30 | |
| 3 | TechBiz Under PMA | Make : SAMSUNG Model : AR50H19D1XHNNA | 26-09-2026 16:44:27 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SANGANAKAH TECHTRONIC PRIVATE LIMITED Under PMA | Item Categories : Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2),Inverter (V2) | |
| L2 | M/S POWER MAX Under PMA | Item Categories : Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2),Inverter (V2) | |
| L3 | TechBiz Under PMA | Item Categories : Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2),Inverter (V2) |
Please sign in or create an account to view contract details and download result documents.
Quantity
37
Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2)
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
10
OEM Avg. Turnover
10
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) , Inverter (V2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Rayagada
Delivery Pincodes
765001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| SAROJINI BAG | 765001,At Po Distt -Rayagada Odisha | Rayagada | Odisha | 765001 | 26 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about ODISHA tender market
Bidders must submit GST registration, PAN, and OEM authorization, along with a datasheet matching offered ISI-marked wall-mount split AC with inverter. Ensure 5+ years residual market life and provide Malicious Code Certificate. The bid allows a 25% quantity adjustment at contract and requires data sheet verification to avoid rejection.
Required documents include GST certificate, PAN, company annual financials, experience certificates for similar AC supply, OEM authorization, product datasheet, and Malicious Code Certificate. A non-obsolete product must be offered; data sheet must align with quoted parameters and regulatory compliance for hazardous materials if applicable.
The product must be ISI marked and compliant with IS 1391 (Part 2) for the wall-mount split AC with inverter (V2). The bid requires a data sheet that proves ISI conformity and ongoing compliance with IS 1391 standards at the time of submission.
Delivery starts from the last date of the original delivery order; if the option clause is exercised, the extended delivery period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
EMD details are not specified in the data; bidders should expect standard government requirements and verify the exact amount in the tender documents. Ensure readiness to submit the EMD as per buyer guidelines during bid submission.
Prepare a data sheet precisely aligned with the offered ISI marked wall-mount split AC with inverter V2. Cross-check model numbers, capacities, power ratings, and ISI certification. Any mismatch may lead to bid rejection; attach datasheet with the bid and reference IS 1391 compliance.
GST will be reimbursed as actual or at applicable rates, whichever is lower. The bidder bears responsibility for correct GST calculations; ensure the bid clearly indicates the GST percentage and allowable exemptions if any.
If quantity changes by up to 25%, the extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. The purchaser may further extend within contract limits at contracted rates.