Progress
The Darbhanga District Panchayats under the Department of Panchayati Raj invites bids for E-cart for Goods and Tricycle or Rickshaw for Carrying Goods in Darbhanga, Bihar 846001. The procurement scope covers Q3 category items with no BOQ items listed. Bid terms include an option clause up to 25% quantity increase/decrease, and an implied need for detailed design approvals. A unique requirement is the submission of Detailed Design Drawings within 5 days of contract award, with Buyer feedback provided within 5 days and adjustments incorporated before delivery. The lack of a specified estimated value or EMD is offset by ATC-driven schedule and design-approval controls. Key differentiators include design validation by the Buyer and adherence to extension logic for delivery windows. This tender emphasizes compliant fabrication and rapid drawing approval as critical success factors, alongside standard post-award supply obligations.
Water Cooler/RO System combination required with compliance to Water Cooler 60/1 20 and RO 50 LPH specifications
OEM authorization mandated if not the manufacturer
Technical brochure or data sheet must accompany bid showing offered specifications
Warranty/AMC commitments must be demonstrated
Past supply evidence required where applicable
Detailed Design Drawings to be approved within 5 days of contract award
Option clause permitting ±25% quantity variation during contract
Delivery period adjustment if Buyer delays design approvals
Must submit detailed design drawings within 5 days of award
Not explicitly specified; typical GeM terms may apply per contract.
Delivery period starts after original delivery order; extended time based on quantity variation with minimum 30 days.
Not explicitly stated; penalties would follow standard contract terms or GeM guidelines.
GST registration
PAN card
Udyam/MSME (if applicable)
GeM Seller ID
ITR
CA turnover certificate with UDIN
Non-blacklisting affidavit
OEM authorization for non-manufacturer bidders
Quantity
19
Category
E-cart for Goods
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
25
OEM Avg. Turnover
7
Past Performance
30 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
E-cart for Goods (Q3) , Tricycle or Rickshaw for Carrying Goods (V2) (Q3)
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Pre-Bid Date
07-09-2026 12:00:00
Pre-Bid Venue
PANCHYAT BHAWAN GRAM PANCHYAT HARIPUR BLOCK BENIPUR DIST DARBHANGA
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Darbhanga
Delivery Pincodes
847233
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| SANJAY KUMAR | 847233,gram panchayat haripur | Darbhanga | Bihar | 847233 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
PAN Card of Firm/Proprietor
Udyam/MSME Registration Certificate, if applicable
GeM Seller ID / Seller Registration Details
Latest Income Tax Return (ITR)
CA Certified Turnover Certificate with UDIN
Non-Blacklisting Declaration/Affidavit
OEM/Manufacturer Authorization Letter for Water Cooler/RO System, if bidder is not the manufacturer
Product Technical Brochure / Catalogue / Data Sheet
Signed Technical Compliance Sheet for Water Cooler 60/1 20 and RO 50 LPH
Past Supply / Experience Documents (PO/Invoice/Completion/Performance)
Warranty / After-Sales Service Undertaking
Authorized Representative Letter & Identity Proof for Pre-Bid Meeting
Signed and Stamped Bid/BOQ/ATC Acceptance
Key insights about BIHAR tender market
Bidders must meet eligibility: GST, PAN, Udyam if applicable, GeM ID, IT returns, turnover certificate with UDIN, and non-blacklisting. Provide OEM authorization if not the manufacturer, plus product data sheets and signed technical compliance. Detailed design drawings must be submitted within 5 days of award, with approvals provided within 5 days.
Submit GST, PAN, Udyam/MSME (if applicable), GeM ID, IT Returns, CA turnover with UDIN, non-blacklisting affidavit, OEM authorization for non-manufacturer, product brochure, signed technical compliance, past supply records, warranty/AMC, and attendee identity proof for pre-bid meeting.
Provide a data sheet showing Water Cooler 60/1 20 and RO system rated at 50 LPH, with verified certificates. Include compliance statement in the Technical Compliance Sheet, and ensure warranty/after-sales terms are clearly documented.
Detailed Design Drawings must be submitted within 5 days of award; Buyer will respond with approval or modification list within the next 5 days, after which supply must align to approved drawings with modifications.
Option clause allows ±25% quantity changes at contract, with delivery time adjusted by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, and extension up to the original period while maintaining contracted rates.
Provide Purchase Orders, Invoices, Completion certificates, or Performance certificates demonstrating relevant supply of Water Cooler/RO systems, along with contact references and project scope details.
Submit a Warranty/After-Sales Undertaking covering supplied equipment, including service response times, parts availability, and maintenance tenure as per buyer’s expectations and any OEM requirements.
Provide OEM Authorization Letter from the original manufacturer for the offered Water Cooler/RO System. If you are the manufacturer, this document is not required; otherwise, submit a formal authorization with product model details.