Bid Publish Date
01-Sep-2026, 10:59 am
Bid End Date
30-Sep-2026, 3:00 pm
EMD
₹77,780
Location
Progress
North Eastern Electric Power Corporation Limited announces a tender for Capacitance and Tan Delta Measurement Kit (V2) (Q3) ( PAC Only) in PAPUM PARE, ARUNACHAL PRADESH. Quantity: 1. Submission Deadline: 30-09-2026 15: 00: 00. Last date to apply is approaching fast!
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
19
OEM Avg. Turnover
78
Past Performance
50 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Capacitance and Tan Delta Measurement Kit (V2) (Q3) ( PAC Only )
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Papum Pare
Delivery Pincodes
791112
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Bipul Borah | 791112,POWER HOUSE STORE DIKRONG POWER HOUSE RHEP, NEEPCO LTD. HOJ | Papum Pare | Arunachal Pradesh | 791112 | 1 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
CATALOG Specification
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| CONSTRUCTION | Measurement Range for Capacitance | 10pF to 1μF with Resolution of 0.01pF or better |
| CONSTRUCTION | Measurement Range for Tan Delta | 0 to 100% with Resolution of 0.01% or better |
| CONSTRUCTION | Accuracy for Tan Delta | 1% of reading ± 0.02% |
| CONSTRUCTION | Accuracy for Capacitance | 0.5 % of reading ± 1pF |
| PC INTERFACE | Number of Laptop for each unit (in Nos) | Without Laptop. Inbuilt LCD monitor and with data storage facility |
| PC INTERFACE | Processor | Not applicable |
| PC INTERFACE | RAM | Not applicable |
| PC INTERFACE | HDD capacity | Not applicable |
| PC INTERFACE | Display size | Not applicable |
| PC INTERFACE | Combo DVD drive having CD read / write facility | Not applicable |
| PC INTERFACE | Pre-loaded operating system | Not applicable |
| PC INTERFACE | Pre-loaded latest version of application software for storage of analysis and record management | Not applicable |
| PC INTERFACE | Power cables with chargers | Not applicable |