TenderDekho Logo
Active GEM

Indian Army Engine Overhauling Tender Dimapur Nagaland 2026 Complete Engine Overhauling

Bid Publish Date

05-Sep-2026, 6:49 pm

Bid End Date

15-Sep-2026, 7:00 pm

Progress

Issue05-Sep-2026, 6:49 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, Dimapur (Nagaland) invites bids for COMPLETE ENGINE OVERHAULING. The procurement location is Dimapur, Nagaland, and the scope covers engine overhaul services for military applications. Key differentiator is the option clause allowing ±25% quantity variation and extended delivery with contracted rates. The clause aligns delivery timing with the last original delivery order date and imposes a minimum additional lead time of 30 days. This tender emphasizes flexible quantities and structured delivery windows to accommodate Army requirements.

Technical Specifications & Requirements

  • Product/service: COMPLETE ENGINE OVERHAULING for military engines
  • Quantity flexibility: ±25% of bid/contract quantity during and after award
  • Delivery timing: calculated as (Extended quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days
  • Delivery start: from the last date of the original delivery order
  • Additional time: may be extended within the original delivery period per option clause
  • BOQ: total items listed as 0, no itemized BOM provided
  • Compliance emphasis: terms require bidder adherence to option-based delivery extensions and orderly ramp-up

Terms, Conditions & Eligibility

  • EMD: not disclosed in available data; ensure readiness to provide as per standard Army tender practices
  • Qualification: bidders must comply with option clause and meet delivery-scoped performance obligations
  • Scheduling: bidders may face delivery adjustments up to 25% with contract rates
  • Documentation: prepare standard corporate and financials to align with Army procurement norms
  • Penalties: clauses imply liquidated-damages considerations via delivery noncompliance, though specifics are not spelled out
  • Warranty/Support: not specified in data; bidders should anticipate Army post-overhaul service expectations

Key Specifications

  • Product/service names: COMPLETE ENGINE OVERHAULING

  • Quantities: ±25% variation allowed

  • Estimated value: Not disclosed

  • Delivery: based on last original delivery order date with minimum 30 days

  • Standards/Certifications: Not specified in data

  • Warranty/Support: Not specified

Terms & Conditions

  • Key Term 1: Quantity variation up to 25% allowed during and after award

  • Key Term 2: Delivery period calculated with extended lead time minimum 30 days

  • Key Term 3: Delivery starts from the last date of original delivery order; option time may extend within contract

Important Clauses

Option Clause for Quantity

Purchaser may increase or decrease quantity by up to 25% at contract placement and during currency at contracted rates.

Delivery Time Calculation

Additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

Delivery Start Point

Delivery period commences from the last date of the original delivery order.

Bidder Eligibility

  • Experience in engine overhaul or similar mechanical overhaul for military or heavy-duty equipment

  • Ability to demonstrate capacity to absorb ±25% quantity fluctuations

  • Compliance with standard government procurement practices and security requirements

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

1

Past Performance

50 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

COMPLETE ENGINE OVERHAULING

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

DIMAPUR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DIMAPURDIMAPUR--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9852780.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about NAGALAND tender market

How to bid for engine overhaul tender in Dimapur Nagaland 2026

Bidders should prepare corporate details, demonstrate overhaul capability, and be ready to accept ±25% quantity changes at contracted rates. Ensure delivery readiness starting from the last original delivery order date and plan for a minimum 30-day delivery extension if required.

What documents are required for Indian Army engine overhaul procurement in Dimapur

submission typically includes GST registration, PAN, experience certificates for engine overhaul, financial statements, EMD/security deposit, technical compliance documents, and OEM authorizations if applicable. Specifics for this tender follow standard Army procurement norms and must be verified at bid submission.

What are the delivery terms for the Dimapur engine overhaul tender

Delivery starts from the last date of the original delivery order. If quantity increases, the additional time is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. The purchaser may extend within the original delivery period.

What is the EMD for the engine overhaul procurement in Dimapur

EMD amount is not disclosed in the available data. Bidders should be prepared to submit an Earnest Money Deposit as per standard Indian Army tender practices and the final notification, including acceptable payment methods.

What standards or certifications are required for the Dimapur engine overhaul bid

The tender data does not specify IS/ISO standards. Bidders should align with typical military overhaul requirements, maintain quality documentation, and seek OEM authorizations if applicable. Validate any required certifications during post-notice clarification.

When is the bid submission deadline for the engine overhaul tender in Dimapur

Exact submission deadlines are not provided in the data. Interested bidders should monitor official tender portals and respond to any buyer-specific terms when the notice is released, ensuring readiness for standard Army procurement submission timelines.

What are the eligibility criteria for engine overhaul suppliers in Dimapur

Eligibility includes prior overhaul experience, ability to handle quantity fluctuations, financial stability evidence, and compliance with government procurement norms. OEM support or authorizations may be advantageous, and bidders should prepare relevant performance documents.

How will quantity variation affect the engine overhaul contract in Dimapur

Quantity can vary by up to 25% at bid and contract stages. Additional time is calculated via the stated formula, with a mandatory minimum extension of 30 days. Plan capacity and logistics to absorb fluctuating orders without compromising delivery.