TenderDekho Logo
Active GEM

E-nagar Palika Madhya Pradesh Pole-Mounted Outdoor Dustbin Tender Betul 2026 ISO 9001

Bid Publish Date

16-Oct-2026, 9:13 pm

Bid End Date

27-Oct-2026, 5:00 pm

EMD

₹5,000

Progress

Issue16-Oct-2026, 9:13 pm
AwardPending

Tender Overview

Organization: E-nagar Palika Government Of Madhya Pradesh, located in Betul, Madhya Pradesh 460001. Product category: Pole-Mmounted outdoor dustbins (Q3). Scope: Supply, Installation, Testing and Commissioning (SITC) of dustbins. EMD: ₹5,000. Quantity flexibility: Purchaser may vary quantity up to 25% at contract placement and during currency at contracted rates. Estimated value: Not disclosed. This tender emphasizes SITC of durable municipal waste bins, with option-driven delivery adjustments and a clear ISO 9001 requirement for bidders or OEMs. Unique terms include delivery period calculations based on original vs extended orders and minimum 30-day increments. The absence of BOQ items suggests a streamlined procurement framework for standard pole-mounted units. This opportunity is framed for vendors capable of rapid SITC deployment under local government urban sanitation programs.

Technical Specifications & Requirements

  • Scope of supply: Supply, Installation, Testing and Commissioning of pole-mounted outdoor dustbins.
  • Certificates: Bidders must upload all certificates requested in the Bid Document and ATC; non-compliance risks rejection.
  • Standards: ISO 9001 certification is mandatory for bidder or OEM.
  • Turnover criteria: Average annual turnover over the last 3 financial years must meet bid document requirements; if company <3 years old, use post-incorporation years.
  • OEM turnover: OEM of offered product must meet the minimum turnover criteria; for bunch bids, OEM with the highest bid value governs evaluation.
  • Delivery/option clause: Delivery timeframes may extend with quantity adjustments; time extension formula provided with a minimum 30 days.

Terms, Conditions & Eligibility

  • EMD: ₹5,000 (documented as part of bid) and to be submitted as specified by the buyer.
  • Delivery terms: SITC obligations; delivery periods may be recalculated per option clause.
  • Payment terms: Not specified in the excerpt; bidders should refer to bid doc for schedule.
  • Documentation: Mandatory upload of ISO 9001 certificate and other certificates as per ATC; ensure readiness of financial statements and turnover proofs.
  • Qualification: Compliance with ISO 9001; maintain required annual turnover and OEM turnover; verify scope aligns to pole-mounted dustbin procurement.
  • Flexible quantity: 25% additional quantity allowed; ensure pricing is valid for variations.

Key Specifications

  • Product: Pole-Mounted Outdoor Dustbin (Q3)

  • Quantity: Flexible up to +25% during contract; delivery timelines extend accordingly

  • Standards: ISO 9001 certification required for bidder or OEM

  • Delivery: SITC including installation and commissioning

  • EMD: ₹5,000

  • No BOQ items available; scope defined as SITC; ensure compliance with municipal procurement terms

Terms & Conditions

  • Quantity variation up to 25% with adjusted delivery period

  • ISO 9001 certification mandatory for bidder or OEM

  • SITC scope: supply, installation, testing and commissioning

  • EMD of ₹5,000; mandatory bid document certificates

Important Clauses

Payment Terms

Not specified in excerpt; bidder to refer to detailed bid document for schedule and milestones

Delivery Schedule

Delivery period may be extended when option clause is exercised; minimum 30 days required; calculated as (Increased quantity ÷ Original quantity) × Original delivery period

Penalties/Liquidated Damages

Not detailed in provided data; bidders should review bid documents for LD/penalty terms

Bidder Eligibility

  • ISO 9001 certification either bidder or OEM

  • Minimum average annual turnover as specified in bid document (3-year average)

  • OEM turnover criteria met for the offered product

  • Submit required certificates and financials with bid

Advertisement

Tender Data

Bid Details

Quantity

50

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Pole-Mounted Outdoor Dustbin (Q3)

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Betul

Delivery Pincodes

460661

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mahaboob Khan460661,Tilak Ward No.2 near Bus Stand, MultaiBetulMadhya Pradesh4606615060-

Authority Records

URBAN DEVELOPMENT AND ENVIRONMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10050029.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Municipal Council Multai

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Audited financial statements for last 3 years or CA/CMA turnover certificate

4

ISO 9001 certificate (bidder or OEM)

5

OEM authorization (if applicable)

6

Technical bid document

7

EMD payment proof (₹5,000)

8

Bid document uploads as per ATC and Corrigendum

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid for pole-mounted outdoor dustbin tender in Betul Madhya Pradesh 2026?

Bidders must submit EMD ₹5,000, GST and PAN, ISO 9001 certification for bidder or OEM, turnover proof for last 3 years, and turnover compliance as per bid document. Include SITC scope documents and OEM authorization if required; ensure all bid certificates are uploaded per ATC and Corrigendum.

What documents are required for dustbin tender submission in Betul?

Required documents include GST certificate, PAN, 3-year audited turnover or CA turnover certificate, ISO 9001 certificate, OEM authorization (if applicable), technical bid, EMD receipt of ₹5,000, and all bid-specific certificates listed in ATC.

What are the delivery terms for the Betul dustbin procurement?

Delivery is SITC: supply, installation, testing and commissioning of pole-mounted outdoor dustbins. The option clause allows quantity changes up to 25%, with a delivery extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What is the ISO standard requirement for bidders in this tender?

Bidders or the OEM must hold ISO 9001 certification. This is mandatory to qualify; non-compliance leads to rejection. Ensure the certificate covers relevant quality management systems for manufacturing or supplying dustbins.

What is the EMD amount and its submission method for this tender?

The EMD amount is ₹5,000. Submit via the prescribed method in the bid document (online or DD as specified). Include EMD proof with bid submission to avoid rejection and ensure eligibility.

What turnover criteria apply to bidders and OEMs for this procurement?

Bidders must meet the average annual turnover requirement over the last three financial years ending 31st March; OEMs must meet the same turnover criterion for the offered product. If the company is under 3 years old, use post-incorporation years for calculation.

Are there any special quantity adjustment or extension conditions?

Yes. The purchaser may increase or decrease quantity by up to 25% at contract placement and during the currency at contracted rates. Delivery extension uses the formula tied to original and extended quantities with a 30-day minimum.

Where can I find the exact bid certificates required for submission?

Refer to the Bid Document, ATC and Corrigendum for the complete list of certificates. Ensure uploaded certificates include ISO 9001, turnover proofs, OEM authorizations, and any product-specific certifications.

Advertisement