Progress
Organization: Bokaro Steel Plant, a unit of the Steel Authority of India Limited, invites a service tender for the dismantling and relining of SMS-II converter columns. The estimated contract value is ₹7,49,420.08. Location is Jharkhand; no start/end dates are disclosed here. The procurement is categorized under Custom Bid for Services and references a detailed Scope of Work (SOW) and ATC documents uploaded by the buyer. The tender emphasizes execution of specialized metallurgical refurbishment activities with safety and method compliance as key differentiators. The absence of BOQ items suggests a tightly defined SOW requiring vendor-specific methodologies.
Dismantling and relining of SMS-II converter columns
Estimated contract value: ₹7,49,420.08
Location: Jharkhand
BOQ items: Not available; scope defined in SOW/ATC
Standards/quality: to be specified in ATC/SOW
EMD amount and payment terms to be specified in ATC
Delivery schedule to be defined in Scope of Work
Submission requires GST, PAN, experience and financial documents
Detailed payment terms will be provided in ATC; bidders should review SOW for milestone-based or full settlement provisions
Execution timeline to be defined in Scope of Work; ensure alignment with site shutdown and safety approvals
LD terms, if any, to be specified in ATC/SOW; prepare for performance-based penalties tied to schedule or quality
Experience in dismantling and relining metallurgical converter components or equivalent plant refurbishments
Compliance with site safety standards and applicable regulations
Proven financial stability to undertake a ₹7,49,420.08 contract and provide required security
Quantity
1
Similar Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
7 Days
EMD Required
No
MII Compliance
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
191
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Custom Bid for Services - Dismantling and Relining of SMS-II converter columns
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
827001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anand Kumar Yadav | 827001,RED , BSL, SAIL | Bokaro | Jharkhand | 827001 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar refurbishments
Financial statements demonstrating capacity
EMD/Security deposit documents as per ATC
Technical bid documents and approach/methodology
OEM authorizations or attestations if required in ATC
Key insights about JHARKHAND tender market
Bidders should review ATC and SOW attached by Bokaro Steel Plant, ensure GST and PAN readiness, gather experience certificates for similar refurbishments, and submit technical and financial bids with required security. The exact EMD is disclosed in ATC; follow defined delivery milestones in the SOW.
Required documents include GST certificate, PAN card, experience certificates for comparable projects, financial statements, EMD documents as per ATC, and technical bid documents or OEM authorizations if specified. Ensure scope alignment with SOW and safety compliance.
Technical scope covers dismantling and relining of SMS-II converter columns. Specific methods, safety requirements, and quality standards will be defined in the Scope of Work and ATC. No BOQ items are listed; proposals must reflect customized execution plans.
The exact delivery schedule will be defined in the Scope of Work. Vendors should plan for site access, safety approvals, and sequential dismantling/relining steps consistent with plant shutdown windows.
Payment terms will be specified in the ATC/SOW. Vendors should anticipate milestone-based or phased payments tied to completion of defined refurbishment stages and acceptance testing after commissioning.
EMD details are provided in the ATC. Bidders must ensure the correct security deposit is prepared and submitted as per the tender’s ATC instructions to participate.
Eligibility requires demonstrated experience in similar metallurgical refurbishments, compliance with safety norms, and financial capability. Cross-check with ATC for any OEM authorizations and specific certifications demanded.
Site safety norms as defined by Bokaro Steel Plant and SAIL will apply; confirm in ATC/SOW for required certifications, PPE, risk assessments, and method statements prior to submission.