Progress
Product/service: Ionization-based potable water purification system
Quantity/scope: Supply, installation, testing, commissioning, operator training
Delivery: Quantity variation up to 25%; delivery period starts after original delivery order
Certification: Not specified in data; verify ATC for IS/ISO requirements
Warranty/maintenance: Not specified; verify in ATC or supplier quote
OEM/Brand: OEM authorization required for MSE benefits
Key term: Quantity variation up to 25% at contracted rates
Key term: Delivery period calculation with minimum 30 days extension
Key term: MSE reservation eligibility with Udyam registration
Key term: Complete scope including training and statutory clearances
Key term: Documentation submission including GST, PAN, and OEM authorizations
Not specified in data; expect standard GeM terms to apply; verify in ATC.
Delivery period starts from the last date of original delivery order; extended time based on (increase/original) × original delivery period with a minimum of 30 days.
Not specified in data; check ATC for LD clauses and performance security requirements.
Must comply with quantity variation rights and delivery timing
Must pass MSE reservation eligibility via Udyam portal and online validation
Must provide OEM authorization and maintain financial standing (no liquidation/bankruptcy)
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
75 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Potable Water Purification System DE - Ionization Based (Q3)
Max Delivery Days
50
Delivery Locations
1
Delivery Cities
Araria
Delivery Pincodes
854331
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pramod Kumar | 854331,Ward No-02, Gram Panchyat- Rahatmina, Block- Kursakata, District- Araria | Araria | Bihar | 854331 | 1 | 50 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates (similar projects in potable water or purification systems)
Financial statements (audited, as applicable)
EMD document or alternative as per GeM terms (per ATC)
Technical bid documents and compliance statements
OEM authorization / manufacturer credentials
Udyam Registration (for MSE reservation eligibility)
Key insights about BIHAR tender market
Bidders must register on GeM, upload GST, PAN, experience certificates, financial statements, and OEM authorizations. Ensure Udyam online validation for MSE benefits. Prepare technical compliance and warranty details, and be ready for supply, installation, testing, commissioning, training, and statutory clearances as applicable.
Submit GST certificate, PAN card, experience certificates for similar purification projects, auditable financial statements, EMD document, OEM authorization, technical compliance certificates, and Udyam registration if claiming MSE benefits. Include bid security as per GeM ATC.
Delivery period begins after the last date of the original delivery order. If quantity increases by up to 25%, the extended period is calculated as (increased quantity/original quantity) × original period, with a minimum extension of 30 days and possible further extension up to the original delivery timeframe.
Only Micro and Small Enterprises registered in the State with valid Udyam credentials, manufacturer/OEM of the offered product, and online validation by GeM and buyer evaluation can claim benefits. Resellers are not eligible for product bids.
Specific standards are not listed in the provided data. Bidders should review the ATC document and any OEM specifications to confirm IS/ISO compliance requirements and ensure product certifications are included in the bid package.
Scope includes supply, installation, testing, commissioning of the potable water purification system, and operator training. It may also require statutory clearances if applicable, with the complete package priced in the bid.