Progress
Organization: North Eastern Electric Power Corporation Limited; Product/Service: Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) with PAC Only; Category: Air Conditioning equipment; Scope: ISI 1391 Part 2 (V3) PAC Only, with vendor code setup and service support considerations; Key qualification: ISO 9001 certification for bidder or OEM; Location: NE region (NEEPCO’s operating area); Quantity / Value: Not disclosed; emphasis on ISI mark and PAC authorization; Unique aspect: ATC indicates specific ISI and PAC constraints, with option clause for quantity variation up to 25%.
Product: Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) PAC Only
Certification: ISO 9001 certification for bidder or OEM
Documentation: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate
Service: Escalation Matrix for service support
Delivery: Option clause allows +25% quantity variation; delivery time calculation with minimum 30 days
Option quantity variation up to 25% during contract
ISO 9001 certification mandatory for bidder or OEM
IS 1391 (Part 2) V3 ISI marked PAC only requirement
PAN, GSTIN, cancelled cheque, EFT mandate submission required
Escalation matrix must be provided for service support
Not specified in data; bidders must comply with ATC and standard procurement terms of NEA/NEEPCO
Delivery period starts from last date of original delivery order; option quantity variation may extend period; minimum extension time 30 days
Not specified in data; ATC references may include penalties in bid document
Must hold ISO 9001 certification either for bidder or OEM
Must submit PAN, GSTIN, Cancelled Cheque, EFT Mandate
Must comply with ISI Marked standard IS 1391 (Part 2) for wall-mount AC (V3) PAC Only)
Quantity
8
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
14
OEM Avg. Turnover
10
Past Performance
80 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( PAC Only )
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Doyang Hydro Electric Plant
Delivery Pincodes
797100
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shibasis Baidya | 797100,Doyang Hydro Electric Plant, Nagaland | Doyang Hydro Electric Plant | - | 797100 | 8 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
27-Oct-2026, 11:30 am
Opening Date
28-Oct-2026, 11:30 am
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about NAGALAND tender market
Bidders should ensure ISI Marked compliance to IS 1391 (Part 2) for wall-mount split AC (V3) PAC Only, have ISO 9001 certification either for bidder or OEM, and submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate along with bid. Follow ATC documented terms and ensure Escalation Matrix is provided for service support.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and ISO 9001 certificate for bidder or OEM. Also attach any certificates requested in the ATC and provide service escalation contact details for after-sales support.
Delivery terms allow quantity variation up to 25% during contract; delivery period starts from last date of original delivery order with a minimum extension time of 30 days. If original period < 30 days, extension equals original period; final delivery timing depends on option clause exercised.
Suppliers must have ISI marked split AC units compliant with IS 1391 (Part 2) V3 for PAC Only and ISO 9001 certification for bidder or OEM. Documentation includes PAN, GSTIN, EFT Mandate, and a formal Escalation Matrix for service support.
Deadline details are not provided in the data; bidders should monitor ATC documents and procurement portal notices for final submission dates, along with the ISI compliance and ISO 9001 prerequisites.
Prepare a structured Escalation Matrix listing contact numbers, roles, and response times for critical faults. Include primary, secondary, and tertiary contacts, with availability windows and escalation triggers aligned with OEM and bidder commitments.
Scope requires wall-mount split AC units to be ISI Marked under IS 1391 (Part 2) with V3 configuration suitable for PAC Only procurement. Ensure product packaging, electrical ratings, and performance meet the standard, and that OEM confirms ISI marking on the equipment.