The Uttar Pradesh Urban Development Department, operating through E-municipalities for citizens and employees, invites bids for decorative lighting poles (V2) under Q3 category in Kaushambi, UP 212108. The scope covers Supply, Installation, Testing, and Commissioning of decorative lighting poles. The bid includes an EMD of ₹16,000 and a potential quantity adjustment of ±25% during contract execution. Bidders must demonstrate three-year turnover (or equivalent) and OEM turnover criteria as per bid document, with CA/certified statements accepted. The award may hinge on meeting service-center presence in each consignee state for carry-in warranties. The tender emphasizes compliance with extended delivery dynamics and option-based quantity adjustments.
No product specifications are published; the buyer highlights a comprehensive scope: supply of decorative lighting poles (V2, Q3) with installation, testing, and commissioning. The Terms call for adherence to option-based quantity adjustments (up to 25%), and delivery time logic linked to original/order dates. Turnover prerequisites require audited balances or CA certificates for last three years, and OEM turnover criteria apply to the primary product category. Service-center availability is mandated in the state of every consignee for carry-in warranty scenarios, with on-site warranty exempted. The BOQ lists zero items, signaling a potentially framework or single-category procurement rather than a detailed bill of quantities.
Key terms include: EMD of ₹16,000; quantity variation up to 25%; delivery timing tied to last delivery order date; three-year average turnover proof; OEM turnover criterion; mandatory functional service centers in each consignee state for carry-in warranty; scope includes Supply, Installation, Testing, and Commissioning; documentation must include audited balance sheets or CA certificates; compliance with bid terms is required for bid validity and contract award.
Product: Decorative lighting pole (V2) in Q3 category
Scope: Supply, Installation, Testing and Commissioning
EMD: ₹16,000
Quantity adjustment: ±25% during contract and currency of contract
Delivery logic: time calculated from last date of original delivery order
Service requirement: Functional service center in each consignee state for carry-in warranty
BOQ: No items listed; indicative framework-based procurement
EMD of ₹16,000 and performance risk
25% quantity variation rights during/after award
Three-year turnover requirement with CA/audited statements
OEM turnover criteria for primary product category
State-wise service center presence for carry-in warranty
Not explicitly stated; standard GEM terms apply with supply, installation, testing, and commissioning scope.
Delivery period linked to the last date of original delivery order; option-based extensions follow the delivery time formula.
Not specified; penalties would follow applicable government tender guidelines and contract terms.
Minimum average annual financial turnover for last 3 years as per bid document
OEM turnover criterion for primary product category
Functional service centers in every consignee state for carry-in warranty
Quantity
8
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Decorative Lightning Pole (V2) (Q3)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kaushambi
Delivery Pincodes
212204
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shivam Maurya | 212204,Nagar Panchayat Daranagar-Kadadham, Kaushambi | Kaushambi | Uttar Pradesh | 212204 | 8 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
29-Oct-2026, 12:30 pm
Opening Date
30-Oct-2026, 12:30 pm
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements for last 3 years or CA certificate indicating turnover
CA/Cost Accountant certificate validating turnover details
OEM authorization letter (if applicable to the offered product)
Evidence of functional service centers in each consignee state (if carry-in warranty applies)
Bidder’s declaration of acceptance of quantity variation up to 25%
Key insights about UTTAR PRADESH tender market
Prepare the bid with EMD ₹16,000, supply, installation, testing, and commissioning scope, and provide turnover proof for last 3 years via audited statements or CA certificate. Include OEM authorization if applicable and demonstrate service centers in each consignee state. Ensure compliance with the option clause for ±25% quantity and the delivery formula from the last delivery date.
Submit GSTIN, PAN, audited financials or CA certificate for turnover, OEM authorization, service-center proof in each consignee state, EMD of ₹16,000, and declarations for quantity variation. Provide past project experience if requested and ensure bid validity as per tender terms.
OEM turnover must meet the minimum average annual turnover for the last 3 years as specified in the bid document, supported by audited balances or CA certificates. If the OEM is under 3 years old, turnover is calculated from completed years post-incorporation for the criterion.
Delivery is calculated from the last date of the original delivery order. If the option clause is exercised, additional time equals (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days, and may extend up to the original delivery period.
Yes. Bidder/OEM must have a functional service center in the state of each consignee for carry-in warranty; this does not apply if the product carries on-site warranty. Proof of service centers should be included in the bid submission.
The scope includes Supply, Installation, Testing, and Commissioning of decorative lighting poles (V2) under Q3, with possible quantity adjustments up to 25% and delivery timing tied to the last order date, as per Buyer Added Terms.
The Purchaser may increase or decrease quantity up to 25% at contract placement and during the contract currency. The extended time is calculated by a formula, with a guaranteed minimum delivery window, ensuring project continuity.
The EMD amount is ₹16,000. Bidders must submit this as a security deposit along with technical and financial bids to participate in the tender process.