Central Mine Planning And Design Institute Limited (CMPDI) under Coal India Limited invites bids for a Tea Leaf procurement in Bilaspur, Chhattisgarh. Estimated value listed at ₹88,811.00 with an option to adjust up to ±25% of bid quantity. Delivery is staggered: an initial 38 units within 10 days of contract placement, followed by 38 units per month. Items must withstand GST considerations as applicable, with data sheets matched to technical parameters. The contract requires installation/commissioning where applicable and formal invoicing in the consignee’s name with GSTIN. Unique terms include a requirement to avoid subcontracting without prior written consent and to strictly align with the data sheet. Geographic scope is limited to CMPDI’s Songanga complex in Bilaspur (ZIP 495006). This tender emphasizes delivery scheduling flexibility, benchmark shelf-life requirements, and a fixed delivery sequence that supports phased supply.
Tea leaf procurement aligned with data sheet uploaded by bidder
Delivery: initial 38 units within 10 days; subsequent 38 units per month
Shelf life: minimum 50% usable shelf life on delivery
GST: bidder bears applicable GST; CMPDI reimbursement per actuals or applicable rates
Invoicing: consignee name with GSTIN on all invoices
No BOQ items; data sheet-driven evaluation
Quantity variation up to 25% during contract at contracted rates
Staggered delivery schedule with monthly increments
Data Sheet accuracy is mandatory for bid evaluation
Invoice must be raised in the consignee name with GSTIN; GST handling as per actuals or applicable rate; no explicit payment timeline provided
38 units within 10 days of contract placement; 38 units every month thereafter; option to adjust quantity during contract and currency
Not explicitly stated in data; standard CMPDI terms to apply if delivery/default occurs; verify in final terms
Must upload Data Sheet aligning with offered product specifications
Must be eligible for GST and have valid GSTIN
No subcontracting without prior written consent from CMPDI
Quantity
456
Bid Type
Single Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
3 months
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Tea Leaf (??? ?????) (Q4)
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
38
Delivery Locations
1
Delivery Cities
Bilaspur
Delivery Pincodes
495006
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Himanshu Vashishtha | 495006,REGIONAL INSTITUTE V, CENTRAL MINE PLANNING & DESIGN INSTITUTE LIMITED, SECL COMPLEX, SIPAT ROAD | Bilaspur | Chhattisgarh | 495006 | - | 38 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate (bidders)
PAN card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
Data Sheet of offered product(s)
Experience certificates (if any in tea leaf procurement)
OEM authorization or vendor authorization (if applicable)
Financial statements (as required by CMPDI terms)
Key insights about CHHATTISGARH tender market
Bidders must submit the Data Sheet for offered tea leaf, GSTIN, PAN, cancelled cheque, and EFT mandate. Ensure staggered delivery (38 units in 10 days, then 38 monthly) and conformance with shelf life of ≥50%. Invoices must be in the consignee name with GSTIN; avoid subcontracting without consent.
Required documents include GST registration, PAN, GSTIN copy, cancelled cheque, EFT mandate, Data Sheet, and any OEM authorizations if applicable. Experience certificates and financial statements may be requested. Ensure data sheet consistency with product specifications to avoid rejection.
Delivery begins with 38 units within 10 days of contract placement, followed by 38 units per month. Quantity variations up to 25% are allowed during contract and currency at contracted rates. Installations, if covered, are at CMPDI Songanga Complex, Bilaspur.
Bidder bears GST applicability; CMPDI reimburses actual GST or applicable rate, whichever is lower, on the quoted value. Invoice must reflect consignee GSTIN and be issued in consignee name.
Deliveries must have a minimum usable shelf life of 50% at the time of supply; confirm remaining shelf life balance to ensure eligibility and avoid rejection during inspection.
Upload a Data Sheet precisely matching offered product specifications; CMPDI will reject bids with unexplained mismatches. Ensure all technical parameters, grade, moisture, and packaging details align with data sheet.
Provide valid GST registration, PAN, data-sheet-aligned product details, and EFT bank mandate. Ensure no subcontracting without buyer consent; demonstrate ability to comply with staggered delivery and shelf-life requirements.
Estimated value is ₹88,811.00; procurement located at CMPDI Complex, Songanga Colony, Near Science College Ground, Seepat Road, Sarkanda, Bilaspur, CG 495006. Delivery must occur to the consignee address with GSTIN compliance.