Progress
Gujarat State Electricity Corporation Limited (GSECL), Vadodara, invites tender for SS SHIMS THICKNESS 1–11 and NON MAGNETIC SS SHIMS SHEETS 1–3. The procurement involves 14 BOQ items with quantities not disclosed in the available data. The tender references Schedule-B and a buyer-added ATC defining technical and supply terms. An option clause permits up to 25% quantity variation at contracted rates, with delivery timing linked to the last delivery order date and a minimum extension of 30 days. The ATC indicates final terms rests with GSECL documents. The procurement aims to secure controlled shim stacks for electrical infrastructure and related assemblies.
Product/service names: SS shim thickness variants 1–11 and non-magnetic SS shim sheets 1–3
Quantities: 14 BOQ items (exact quantities not disclosed)
Estimated value: Not disclosed in available data
Experience: Not specified in excerpt; refer to ATC for technical capability
Quality/standards: Schedule-B and Buyer Added ATC govern specs (final).
Option to increase/decrease quantity up to 25% at contracted rates
Delivery period linked to last date of original delivery order; minimum 30 days extension
Material to be supplied as per Schedule-B and ATC; final terms by GSECL
Not specified in provided data; ATC/documents may constrain payment schedule per Schedule-B
Delivery period starts after the last original delivery order date; option-based extensions with calculated timelines
Not specified in excerpt; likely governed by Schedule-B/ATC terms
Experience in supplying shim components or similar metallic sheets
Ability to comply with Schedule-B and ATC terms
Financial stability evidenced by latest financial statements
Quantity
153
Category
SS SHIMS THICKNESS 1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SS SHIMS THICKNESS 1 , SS SHIMS THICKNESS 2 , SS SHIMS THICKNESS 3 , SS SHIMS THICKNESS 4 , SS SHIMS THICKNESS 5 , SS SHIMS THICKNESS 6 , SS SHIMS THICKNESS 7 , SS SHIMS THICKNESS 8 , SS SHIMS THICKNESS 9 , SS SHIMS THICKNESS 10 , SS SHIMS THICKNESS 11 , NON MAGNETIC SS SHIMS SHEETS 1 , NON MAGNETIC SS SHIMS SHEETS 2 , NON MAGNETIC SS SHIMS SHEETS 3
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
5
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Tapi
Delivery Pincodes
394680
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pallavkumar Maganbhai Solanki | 394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI | Tapi | Gujarat | 394680 | 10 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
SS SHIMS THICKNESS 1
SS SHIMS THICKNESS 1
SS SHIMS THICKNESS 2
SS SHIMS THICKNESS 2
SS SHIMS THICKNESS 3
SS SHIMS THICKNESS 3
SS SHIMS THICKNESS 4
SS SHIMS THICKNESS 4
SS SHIMS THICKNESS 5
SS SHIMS THICKNESS 5
SS SHIMS THICKNESS 6
SS SHIMS THICKNESS 6
SS SHIMS THICKNESS 7
SS SHIMS THICKNESS 7
SS SHIMS THICKNESS 8
SS SHIMS THICKNESS 8
SS SHIMS THICKNESS 9
SS SHIMS THICKNESS 9
SS SHIMS THICKNESS 10
SS SHIMS THICKNESS 10
SS SHIMS THICKNESS 11
SS SHIMS THICKNESS 11
NON MAGNETIC SS SHIMS SHEETS 1
NON MAGNETIC SS SHIMS SHEETS 1
NON MAGNETIC SS SHIMS SHEETS 2
NON MAGNETIC SS SHIMS SHEETS 2
NON MAGNETIC SS SHIMS SHEETS 3
NON MAGNETIC SS SHIMS SHEETS 3
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SS SHIMS THICKNESS 1 | SS SHIMS THICKNESS 1 | 10 | kg | con11.gsecl | 90 | |
| 2 | SS SHIMS THICKNESS 2 | SS SHIMS THICKNESS 2 | 10 | kg | con11.gsecl | 90 | |
| 3 | SS SHIMS THICKNESS 3 | SS SHIMS THICKNESS 3 | 10 | kg | con11.gsecl | 90 | |
| 4 | SS SHIMS THICKNESS 4 | SS SHIMS THICKNESS 4 | 10 | kg | con11.gsecl | 90 | |
| 5 | SS SHIMS THICKNESS 5 | SS SHIMS THICKNESS 5 | 10 | kg | con11.gsecl | 90 | |
| 6 | SS SHIMS THICKNESS 6 | SS SHIMS THICKNESS 6 | 10 | kg | con11.gsecl | 90 | |
| 7 | SS SHIMS THICKNESS 7 | SS SHIMS THICKNESS 7 | 10 | kg | con11.gsecl | 90 | |
| 8 | SS SHIMS THICKNESS 8 | SS SHIMS THICKNESS 8 | 10 | kg | con11.gsecl | 90 | |
| 9 | SS SHIMS THICKNESS 9 | SS SHIMS THICKNESS 9 | 10 | kg | con11.gsecl | 90 | |
| 10 | SS SHIMS THICKNESS 10 | SS SHIMS THICKNESS 10 | 25 | kg | con11.gsecl | 90 | |
| 11 | SS SHIMS THICKNESS 11 | SS SHIMS THICKNESS 11 | 30 | kg | con11.gsecl | 90 | |
| 12 | NON MAGNETIC SS SHIMS SHEETS 1 | NON MAGNETIC SS SHIMS SHEETS 1 | 2 | number | con11.gsecl | 90 | |
| 13 | NON MAGNETIC SS SHIMS SHEETS 2 | NON MAGNETIC SS SHIMS SHEETS 2 | 2 | number | con11.gsecl | 90 | |
| 14 | NON MAGNETIC SS SHIMS SHEETS 3 | NON MAGNETIC SS SHIMS SHEETS 3 | 4 | number | con11.gsecl | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for shim sheet/similar metal components
Financial statements (last 2-3 years)
EMD/Security deposit as per tender terms (not disclosed in data)
Technical bid documents demonstrating Schedule-B compliance
OEM authorization for shim materials (if required by ATC)
Any ISI/ISO certifications cited in ATC or Schedule-B (if applicable)
Key insights about GUJARAT tender market
Bidders should submit GST registration, PAN, experience certificates, financial statements, EMD, and technical bid per the terms. Ensure compliance with Schedule-B and the buyer-added ATC, and be prepared for up to 25% quantity variation and the 30-day minimum extension.
Required documents include GST certificate, PAN, experience certificates for shim-related supply, financial statements, EMD/Security deposit, and OEM authorizations if specified in the ATC. Technical bids must prove Schedule-B conformity.
Technical specifics are governed by Schedule-B and the Buyer Added ATC. Exact thickness variants (1–11) and non-magnetic sheet categories (1–3) imply precise tolerances; bidders must reference the ATC for conformity and testing norms.
Delivery begins after the last date of the original delivery order. If the purchaser exercises the option clause, additional time is calculated as (increased quantity ÷ original quantity) × original period, with a minimum of 30 days.
Bidders must price contracts for the base quantity and be prepared to supply up to 25% more at the contracted rates, with delivery timelines adjusted per the option clause and minimum 30-day extension rule.
Standards are specified in Schedule-B and the ATC; bidders should provide any applicable certifications (e.g., ISO/IS specifications) as required by the ATC while ensuring compliance with Schedule-B.