Bid Publish Date
17-Oct-2026, 2:05 pm
Bid End Date
27-Oct-2026, 3:00 pm
Location
Progress
Organization: Indian Army (Department Of Military Affairs). Procurement: 6-item assortment including brush cutter side packs, lawn mower (electric), hedge trimmer, pole pruner (manual), potato peeling machine, and single mattress. Location: Meerut, Uttar Pradesh 245206. Estimated value and exact quantities are undisclosed; contract allows ±25% quantity variation during both initial and contract periods. Unique terms include sample approval prior to bulk production, and post-acceptance inspections via Board of Officer. This tender emphasizes after-sales support for OEMs with Indian offices for imported products. The scope targets government fleet maintenance and field readiness with standard pre-dispatch checks and possible extension of delivery timelines aligned to order variance. The option clause differentiates this bid by dynamic quantity adjustments and extended delivery windows.
Product/service names: brush cutter side pack, lawn mower (electric), hedge trimmer, pole pruner (manual), potato peeling machine, mattress (single).
Estimated value: not disclosed; quantity variation up to 25% allowed.
Experience: prior procurement of garden maintenance equipment recommended (not explicitly stated).
Standards: IS or ISO certifications not specified in data; OEM/authorized support requirement implied.
Delivery: extension formula = (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days.
Inspection: Board of Officer for post-receipt or pre-dispatch inspection; sampling required prior to bulk supply.
Option clause allows ±25% quantity variation during contract and execution phase.
Imported items require Indian registered OEM/authorized seller for after-sales support with certificate.
Advance sample approval required within 5 days of award; potential modifications within 5 days.
Inspection can be pre-dispatch or post-receipt by designated Board of Officer.
Delivery period adjustments tied to quantity changes with minimum 30 days.
Not explicitly stated; payment terms will be governed by standard contractual conditions and extended delivery provisions tied to quantity adjustments.
Delivery period calculated from last date of original delivery order; extended period requires recalculation using the option clause formula with minimum 30 days.
Not explicitly provided; potential for contract termination if samples deviate beyond approved specifications.
Experience in supplying garden and maintenance equipment to government or large organizations
Ability to supply from OEM or authorized distributors for imported items
Compliance with post-approval sampling and inspection requirements
Quantity
30
Category
Lawn Mower Electric
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
50 %
Warranty Period
2 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Brush Cutter Side Pack , Lawn Mower Electric , Hedge Trimmer , Pole Pruner Manual , Potato Peeling Machine , Mattress Single
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
MEERUT
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | MEERUT | MEERUT | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Brush Cutter Side Pack
Grass Cutting Machine
Lawn Mower Electric
Lawn Mower Electric
Hedge Trimmer
Hedge Trimmer
Pole Pruner Manual
Pole Pruner Manual
Potato Peeling Machine
Potato Peeling Machine
Mattress Single
Mattress Single
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Brush Cutter Side Pack | Grass Cutting Machine | 1 | nos | shailender09 | 15 | |
| 2 | Lawn Mower Electric | Lawn Mower Electric | 1 | nos | shailender09 | 15 | |
| 3 | Hedge Trimmer | Hedge Trimmer | 1 | nos | shailender09 | 15 | |
| 4 | Pole Pruner Manual | Pole Pruner Manual | 1 | nos | shailender09 | 15 | |
| 5 | Potato Peeling Machine | Potato Peeling Machine | 1 | nos | shailender09 | 15 | |
| 6 | Mattress Single | Mattress Single | 25 | nos | shailender09 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar procurement
Company financial statements (audited or interim)
EMD/Security deposit documents
Technical bid documents and compliance certificates
OEM authorization letters for imported items
Any certificates of conformity or testing reports (if available)
Key insights about UTTAR PRADESH tender market
Submit the bidder qualification documents (GST, PAN, experience proofs, financials) and comply with the OEM/seller authorization if importing. Prepare advance sample within 5 days of award, and ensure post-dispatch or pre-dispatch inspection readiness. Understand the option clause enabling up to 25% quantity variation.
Provide GST certificate, PAN, experience certificates for similar procurements, audited financial statements, EMD, technical bid documents, and OEM authorization for imported items. Include inspection readiness plans and proof of Indian after-sales support for OEMs.
Inspection can be pre-dispatch at seller premises or post-receipt at consignee site, conducted by a Board of Officer. Ensure samples are approved within 5 days of award; non-conformity may trigger fresh samples or contract termination.
The Purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during currency at contracted rates; delivery period adjusts based on the formula (Increased quantity ÷ Original quantity) × Original delivery period with a 30-day minimum.
An advance sample must be submitted within 5 days of contract award; buyer provides approval or a modification list within 5 days; bulk supply must conform to approved sample, otherwise modifications or termination may occur.
Yes. Imported items require the OEM or an authorized seller with a registered Indian office to provide after-sales service; a certificate confirming this is required as part of bid submission.
Categories include brush cutter side pack, electric lawn mower, hedge trimmer, manual pole pruner, potato peeling machine, and a single mattress; the tender encompasses both maintenance equipment and lodging furniture for field operations.
Delivery period is tied to the last delivery date; with extensions, the time is recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, ensuring a minimum of 30 days even for extension.