Bid Publish Date
04-Sep-2026, 11:06 am
Bid End Date
14-Sep-2026, 11:00 am
EMD
₹30,000
Value
₹15,00,000
Location
Progress
Organization: South East Central Railway (Indian Railways). Procurement: Composite Office Tables conforming to IS 8126 (V2) (Q2). Estimated value: ₹1,500,000.00; EMD: ₹30,000. Location: Bilaspur, Chhattisgarh (Railway jurisdiction). Scope: Supply, Installation, Testing and Commissioning of office tables. Delivery terms: Option to increase/decrease quantity up to 25%; extended delivery period calculations apply with a minimum of 30 days. Key differentiator: conformity to IS 8126 (V2) standard and installation/ commissioning scope.
GST handling by bidder; payment against delivery with standard supplier terms; no fixed advance mentioned.
Delivery quantity may vary ±25%; delivery period based on original and extended terms with minimum 30 days; installation and commissioning included.
Not specified in provided terms; contract may imply standard penalties for delayed delivery via governing clauses.
Manufacturer authorization as applicable or OEM ownership proof
Demonstrated experience in supplying IS 8126 (V2) compliant furniture
GST registration and tax compliance documentation
Quantity
60
Bid Type
Single Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Warranty Period
1 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Composite Office Tables conforming to IS 8126 (V2) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
4%
ePBG Duration (Months)
14
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Bilaspur
Delivery Pincodes
495004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anurag Kumar Singh | 495004,Sr.DCM Office, DRM Complex, South East Central Railway, Bilaspur (C.G) 495004 | Bilaspur | Chhattisgarh | 495004 | 60 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about CHHATTISGARH tender market
Bidders must submit an EMD of ₹30,000 along with vendor qualification documents, OEM authorization if applicable, and technical bid demonstrating IS 8126 (V2) compliance. Include installation and commissioning plans, warranty details, and GST registration. The bid should reflect the 25% option quantity increase allowances and delivery timelines.
Required documents include GST registration, PAN, OEM authorization or distributor certificate, financial statements or turnover proof, experience certificates for similar office furniture projects, and technical compliance showing IS 8126 (V2) conformity. Also include warranty certificates and post-sale support details.
Delivery must cover supply, installation, testing and commissioning. The option clause allows ±25% quantity variance; delivery periods begin from the last delivery order date. A minimum 30-day extension rule applies if quantity increases during contract execution. Ensure on-site installation with required tools and validated testing results.
Tables must conform to IS 8126 (V2). Vendors should provide IS 8126 (V2) compliant product datasheets, test reports, and any BIS/ISI related certifications if specified by the tender. Include installation methods that align with IS 8126 (V2) dimensional tolerances.
Warranty is 1 year from final acceptance or post-installation completion. OEM warranty certificates must accompany delivery. The supplier must provide prompt on-site rectification during the warranty period and furnish an escalation matrix for service support.
Bidders must determine applicable GST and include it in bids. GST reimbursement will be provided as per actuals or the lower applicable rate, subject to the quoted GST percentage. Ensure pricing is transparent for both supply and installation components.
Pre-dispatch inspection is applicable only if ATC selects it; otherwise, post-receipt inspection occurs at the consignee site. The nominated inspection agency will verify conformity to IS 8126 (V2) and that installation and testing meet contract terms before acceptance.