TenderDekho Logo
Active GEM

Urban Development and Housing Department Bihar Pole-Mounted Outdoor Dustbin Tender Madhubani 2026 - 600000 Estimated Value, 15000 EMD

Bid Publish Date

24-Oct-2026, 12:56 pm

Bid End Date

04-Nov-2026, 1:00 pm

EMD

₹15,000

Value

₹6,00,000

Progress

Issue24-Oct-2026, 12:56 pm
AwardPending

Tender Overview

The Urban Development and Housing Department of Bihar invites bids for a Pole-Mounted Outdoor Dustbin in Madhubani, Bihar. Estimated contract value is ₹6,00,000 with an EMD of ₹15,000. Scope covers Supply, Installation, Testing and Commissioning of dustbins, with an option to increase quantity up to 25% during the contract period. Delivery timelines hinge on delivery orders, and bidders must meet turnover criteria as specified for both the bidder and the OEM. The tender emphasizes ongoing supply, non-obsolescence, and GST alignment by bidders. Unique clause: option-based quantity adjustment and extended delivery periods capped to maintain project continuity.

  • Organization: Urban Development and Housing Department Bihar
  • Location: Madhubani, Bihar
  • Product: Pole-Mmounted Outdoor Dustbin
  • Estimated value: ₹6,00,000; EMD: ₹15,000
  • Key differentiator: option to increase quantity up to 25% at contracted rates; supply-IOO scope includes installation and commissioning

Technical Specifications & Requirements

Despite no explicit technical specs, the tender requires the full lifecycle of a dustbin project: Supply, Installation, Testing, and Commissioning. The procurement expects bidders to align with standard market life of non-obsolete products (minimum 1 year residual market life) and to ensure the product remains OEM-supported during the contract. The terms impose GST diligence by bidders and a clear obligation to meet turnover prerequisites for both the bidder and the OEM over the last three financial years. Potential bidders should prepare to demonstrate capacity for end-to-end delivery and post-installation support.

  • Scope of supply includes SSC: Supply, Installation, Testing, and Commissioning
  • Ensures non-obsolescence and 1-year residual market life
  • GST handling as per actual rates
  • Bidder and OEM turnover criteria over last three years
  • Delivery timing linked to original and extended orders

Terms, Conditions & Eligibility

Key requirements include an EMD of ₹15,000, and a turnover qualification based on three-year average financials (bidder and OEM). The purchaser reserves a 25% quantity variation during and after contract formation. Delivery timeframes depend on delivery orders, with minimum 30-day adjustments if increased quantity is exercised. Additionally, the bidder must avoid liquidation or bankruptcy status and must ensure the offered dustbin remains market-viable for at least one year post-quotation. GST compliance is bidder-specific.

Key Specifications

  • Product: Pole-Mounted Outdoor Dustbin

  • Estimated contract value: ₹6,00,000

  • EMD: ₹15,000

  • Scope: Supply, Installation, Testing & Commissioning

  • Delivery terms: base delivery with option to extend 25% quantity

Terms & Conditions

  • Option clause allows up to 25% quantity increase at contracted rates

  • Delivery period starts from the last date of original delivery order

  • GST to be borne by bidder; reimbursable at actuals or applicable rate

  • Bidder and OEM turnover criteria based on last 3 financial years

  • Maintain non-obsolescence of supplied product for at least 1 year

Important Clauses

Payment Terms

GST handling by bidder; no explicit payment timeline provided in data

Delivery Schedule

Delivery starts after original order; option quantity increases extend time proportionally with a minimum 30 days

Penalties/Liquidated Damages

Not specified in data

Bidder Eligibility

  • Not under liquidation or court receivership

  • Three-year turnover criteria met (bidder and OEM)

  • Not declared obsolete by OEM within 1-year residual market life

Advertisement

Tender Data

Bid Details

Quantity

30

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

25

OEM Avg. Turnover

5

Past Performance

20 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Pole-Mounted Outdoor Dustbin (Q3)

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Madhubani

Delivery Pincodes

847223

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anuj Kumar847223,WARD NO 13, OFFICE OF NAGAR PANCHAYAT BENIPATTIMadhubaniBihar8472233030-

Authority Records

URBAN DEVELOPMENT AND HOUSING DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10076854.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Nagar Panchayat Benipatti

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements for the last three years or CA certificate indicating turnover

4

Experience certificates for similar projects (dustbin/sanitation equipment)

5

OEM authorization documents

6

Bidder undertaking on non-liquidation status

7

Technical bid documents and EMD payment receipt

8

Proof of establishment/incorporation date

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for Madhubani pole mounted dustbin tender in Bihar 2026

To participate, submit GST, PAN, turnover certificates for last 3 years, and OEM authorizations. Include EMD ₹15,000 and ensure the product is not obsolete with at least 1 year residual life. Provide detailed scope: supply, installation, testing, commissioning, and confirm GST compliance and delivery plan under the 25% option clause.

What documents are required for Bihar pole mounted dustbin procurement

Required documents include GST certificate, PAN, audited turnover statements or CA certificate, experience certificates for similar projects, OEM authorization, and EMD receipt. Also include technical bid, proof of incorporation, and undertaking of non-liquidation status as part of the bid submission.

What are the key delivery terms for this dustbin project

Delivery is linked to the last date of the original delivery order with a minimum 30-day adjustment if quantity increases. The purchaser may extend delivery time proportionally for up to 25% more quantity at contracted rates, affecting overall project schedule and warranty commencement.

What are the turnover criteria for bidders and OEMs in this tender

Bidder and OEM must show the minimum average annual turnover over the last three financial years. Documentation can be audited balance sheets or CA-certified turnover, with adjustments if the company is <3 years old. This ensures financial capacity to fulfill supply, installation, and commissioning.

Is there any warranty or post-installation support requirement

The tender imposes a practical expectation of market-life persistence for at least 1 year, with OEM support implied. While explicit warranty days are not specified, bidders should prepare post-installation support and spare part access aligned to market standards.

How is GST handled for the Maharashtra dustbin procurement

GST is the bidder's responsibility to calculate and pay; reimbursement is through actuals or applicable rates, whichever is lower, limited to quoted GST percentage. Ensure GST invoices align with the final contract value and delivery scope.

What is the scope of supply for the dustbin project

Scope includes Supply, Installation, Testing, and Commissioning of pole-mounted outdoor dustbins. Ensure the design matches non-obsolescence criteria, confirm OEM alignment, and provide a delivery and installation schedule compatible with the 25% quantity option.

Advertisement