TenderDekho Logo
Active GEM

Indian Coast Guard AC Compressor 12 TR Tender Visakhapatnam Andhra Pradesh 2026 – 12TR Air Conditioning Procurement

Bid Publish Date

04-Sep-2026, 2:06 pm

Bid End Date

14-Sep-2026, 3:00 pm

Progress

Issue04-Sep-2026, 2:06 pm
AwardPending

Key Highlights

  • OEM Authorization required for non-OEM distributors
  • ±25% quantity variation at contract stage with prorated delivery timing
  • Delivery location: ICGS C-451, MALKAPURAM, Visakhapatnam, AP-530011
  • Data Sheet must match offered product specifications

Tender Overview

The Indian Coast Guard, Department of Defence, seeks the supply of a 12 TR air conditioning compressor for installation at the Visakhapatnam air station. The scope is limited to the supply of goods with freight/installation not explicitly included. Delivery and installation locations are specified as THE COMMANDING OFFICER, ICGS C-451, MALKAPURAM, VISAKHAPATNAM, AP-530011. An option clause allows a ±25% quantity change at contracted rates, with delivery time recalculated accordingly. Data sheets and OEM authorizations are mandatory; bidders must ensure data-sheet conformity with offered products and verify technical parameters. The tender requires bidders to meet organizational and financial safeguards and to comply with standard procurement practices as outlined in the buyer terms.

Technical Specifications & Requirements

  • Scope of supply: Only supply of Goods for a 12 TR AC compressor project; no BOQ items.
  • Delivery address: Commanding Officer, ICGS C-451, C/O CGDHQ-6, Malkapuram, Visakhapatnam, AP-530011.
  • Documentation: Upload Product Data Sheet; if mismatch occurs, bid may be rejected.
  • Authorization: If bid is from an authorized distributor, include OEM authorization with name, designation, address, email, and phone.
  • Contract terms: Purchaser may alter quantity by ±25% during and after order; identical contract rates apply; assignment/sub-contract require prior buyer consent. Scope explicitly notes final delivery/installation, if included, occurs at the stated address.
  • Regulatory/compliance notes: No technical specifications or IS/ISO standards specified in the data; bidders must ensure conformity with procurement norms and OEM capabilities.

Terms, Conditions & Eligibility

  • EMD/ Bid security: Not disclosed in the provided terms; bidders must prepare standard security as per organization policy.
  • Eligibility criteria: Bidders must not be under liquidation or bankrupt; upload an undertaking confirming financial standing.
  • Submission documents: PAN Card, GSTIN, cancelled cheque, EFT mandate (certified by bank), Data Sheet, OEM authorization when required.
  • Delivery & installation: Delivery period aligns with original order and may extend; installation (if scope) at CG location per buyer directions.
  • Liability & compliance: Supplier remains liable jointly with assignee/sub-contractor; no subcontracting without buyer consent.
  • Warranty & penalties: Not specified in the data; bidders should assume standard warranty terms per OEM and applicable LD penalties if contract terms apply.

Key Specifications

  • Product category: 12 TR AC compressor

  • Scope: supply of goods only

  • Delivery address: ICGS C-451, MALKAPURAM, Visakhapatnam, AP-530011

  • Documentation: Data Sheet required; mismatch may lead to bid rejection

  • Authorization: OEM authorization from original manufacturer if bidder is distributor

Terms & Conditions

  • Option to increase/decrease quantity by up to 25% at contract rates

  • Delivery period recalculated based on extended quantity and original period

  • Mandatory Data Sheet alignment; OEM authorization for non-OEM bidders

Important Clauses

Payment Terms

Not specified in data; bidders should verify with issuing authority and prepare standard banking/payment terms per organization policy

Delivery Schedule

Delivery period commences from last date of original delivery order; additional time calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not detailed in provided terms; bidders should inquire about LDs/penalties in final bid documents

Bidder Eligibility

  • Not under liquidation or court proceedings

  • Adequate financial standing as evidenced by undertakings

  • OEM authorization where applicable

  • Compliance with data sheet and supplier documentation

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

9

OEM Avg. Turnover

7

Past Performance

10 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

AC COMPRESSOR 12 TR

Pre-Bid & Qualification

Pre-Bid Date

09-09-2026 10:00:00

Pre-Bid Venue

The Commanding Officer, ICGS C-451, C/o CGDHQ-6, Malkapuram, Visakhapatnam. Contact No. 8275485753

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Visakhapatnam

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VisakhapatnamVisakhapatnam--130-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9831320.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Coast Guard

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Data Sheet of offered product

6

OEM Authorization if bidding through authorized distributor

7

Undertaking of non-liquidity/bankruptcy status

8

Vendor code related documents as per bid

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for AC compressor 12TR tender in Visakhapatnam

To bid, provide the Data Sheet of the 12 TR AC compressor, PAN, GSTIN, cancelled cheque, and EFT mandate. If bidding via an authorized distributor, include OEM authorization with contact details. Ensure compliance with the option clause allowing ±25% quantity changes and delivery terms.

What documents are required for ICGS compressor procurement in Visakhapatnam

Submit PAN Card, GSTIN, Cancelled Cheque, EFT Mandate (bank certified), and the Data Sheet. Include OEM authorization if the bid is from a distributor. Provide an undertaking of non-liquidity and ensure product data matches offered specifications.

What are the delivery terms for 12 TR AC compressor supply

Delivery terms specify the delivery address at Visakhapatnam, with extension rules: quantity changes up to 25% at contract rates and time calculated by (increased/original quantity) × original delivery period, minimum 30 days from order extension.

What is the scope of supply for the 12TR AC compressor tender

The scope is strictly the supply of goods; installation/commissioning is only as per future orders if included. No BOQ items are listed, and data-sheet alignment is required to avoid rejection.

What are the OEM authorization requirements for bidders

If bidding through an authorized distributor, submit OEM authorization with the manufacturer’s name, designation, address, email, and phone. This ensures traceability and compliance with original equipment manufacturing standards.

Is there any specified warranty or penalties in this tender

Warranty terms and LD/penalties are not detailed in the provided data; bidders should confirm with the issuing authority and reference OEM warranty terms during final bid submission.

What is the submission process for the data sheet in the bid

Upload the Data Sheet alongside the bid; any mismatch between data sheet and supplied product can lead to rejection. Ensure all product specifications match exactly what is offered.

What are the eligibility criteria for vendors in this Visakhapatnam tender

Eligibility requires financial stability (non-liquidity), valid PAN/GST, and bank-certified EFT mandate. Provide undertaking of non-bankruptcy status and ensure compliance with supplier terms, including data-sheet conformity and OEM authorization if applicable.