Design, Build, construct, install, and commissioning of Material Recovery Facility (MRF) plant of 25 TPD for dry waste along with operation and maintenance of the plant for 5 years on EPC mode.
Organization Not Specified
BIHARPosted 23 Aug
₹2.5 Cr
EMD: ₹4.9 L
EPROCURE-BIHAR7 DocumentsOpen
Deadline
30 Aug 2026